Bhairab Railway Bridge Bangladesh
International | Railway Bridge

102.4m Span Bhairab Railway Bridge

Bangladesh

10,140
Metric Tons
102.4m
Span Length
110,000
SQM Surface Treatment
Rs. 12.99 Cr
Contract Value

Project Overview

The Bhairab Railway Bridge project for Bangladesh Railways represents one of our most significant international undertakings. This landmark infrastructure project involved the complete fabrication of steel girders for a 102.4-meter span railway bridge, along with comprehensive surface treatment including blasting, metalizing, and painting.

Working under contract with Texmaco Rail & Engineering Ltd., we delivered this complex project within the stipulated timeline while maintaining the highest quality standards as per Indian Railway specifications and RDSO guidelines.

Scope of Work

  • Composite Girder 15.1m x 3 span, 20.1m x 3 span
  • 29.3m x 01 Span and 30.12m x 01 Span (295 MT)
  • Open Web Girder 102.4m Span x 06 Nos. (4,951 MT)
  • Blasting, Metalizing and Painting - 110,000 SQM

Services Provided

  • Fabrication, loading, unloading, handling, marking
  • Cutting, straightening, fitting, welding, drilling
  • Grinding, riveting, finishing, assembling
  • Inspection including preparation of jigs, masters and fixtures
  • Blasting, metalizing and painting as per railway specifications
  • Trial assembly of the fabricated components

Project Gallery

Completion Certificate

This project was completed with a "Satisfactory" performance rating from Texmaco Rail & Engineering Ltd.

Texmaco Completion Certificate