International | Composite Girder
Rupsa Bridge (Bangladesh)
Bangladesh
5,936
Metric Tons
32.5m
Span Length
70
Number of Girders
Rs. 8.43 Cr
Contract Value
Project Overview
The Rupsa Bridge project for Bangladesh represents another successful international undertaking by Maa Tara Fabricator. Working with Essar Steel India Limited (now ArcelorMittal Nippon Steel India), we fabricated 70 composite girders of 32.5-meter span for this critical infrastructure project.
This project showcased our capability to handle large-scale composite girder fabrication with comprehensive surface treatment services, delivering within the timeline with satisfactory performance.
Scope of Work
- Fabrication of Composite Girder 32.5m Span x 70 Nos. (5,936 MT)
- Complete surface treatment including Blasting, Metalizing and Painting
- All machinerise, Tools & Tackles and consumable supplied by MTF
Salient Features
- Fabrication, Loading, Unloading, Handling, Marking
- Cutting, Straightening, Fitting, Welding, Drilling
- Grinding, Riveting, Finishing, Assembling
- Inspection including preparation of Jigs, Masters and Fixtures
- Blasting, Metalizing and Painting
Completion Certificate
This project was completed with a "Satisfactory" performance rating from Essar Steel India Limited.